1. Home /
  2. Commercial and industrial /
  3. American Metal Fabrication

Category



General Information

Locality: Ballwin, Missouri

Phone: +1 314-702-3080



Address: 16315 Downey Terrace Ct 63011 Ballwin, MO, US

Likes: 340

Reviews

Add review

Facebook Blog



American Metal Fabrication 08.11.2020

Another small project finished. We refabricated these parking posts for Captain’s Corner convenience store. Before, most of them were not mounted to the concrete and the paint was faded and rusty. We added new tubing and base plates, sand blasted and powder coated, and secured them with 3/8 wedge anchors. It gives the front of the building a cleaner look and provides protection to the brick columns.

American Metal Fabrication 27.10.2020

We added a hand rail to this porch landing. It gives great support to hold on to, and adds a decorative look!

American Metal Fabrication 19.10.2020

We have been busy! Two customer made trailers built to owner specs. We will post final pictures after sand blast and paint.

American Metal Fabrication 12.10.2020

A customer wanted to rebuild the stand on his beloved smoker to put it back in service. So we got him some new legs and made a few other adjustments as well. Mike Sexton

American Metal Fabrication 29.09.2020

It's the peak of lawn mowing season so let the maintenance begin. American metal fabrication can help. -Sharpening mower blades and balance $8 each -General maintenance -trailer repair and maintenance ... -Custom fabrication See more

American Metal Fabrication 12.09.2020

Small project for this afternoon. Gearing up for hay 2017 season

American Metal Fabrication 27.08.2020

Today we rebuilt a drop hitch for a tractor implement and shot a short video with some helpful tips for the DIY folks out there.

American Metal Fabrication 18.08.2020

Tonight the 00 Emod we adjusted ran great. Started 2nd to last and made his way to 7th when a shock bolt broke and caused him to spin. With a few minor adjustments James Stark and Gavan will be up front. Congrats on a good run guys!

American Metal Fabrication 12.08.2020

Today we finished a full scale session on the 00 E Mod of James Stark and the driver Gavin. Set toe, camber caster, moved pull bar, reset j bar, spring changes in front and rear, moved roughly 300 lbs of lead, and took the car from 250 lbs of right rear bite to 80 lbs of left rear bite. We are anxious to see how he does on the track this coming Friday at lakeside speed way.

American Metal Fabrication 10.08.2020

During this Memorial Day weekend we are offering 15% off all material and labor. No project to big no project to small. Need a fire pit to kick off this weekend? Give us a call. Free estimates and designs.