1. Home /
  2. Contractor /
  3. Jarrell Contracting

Category



General Information

Locality: Earth City

Phone: +1 314-291-0100



Address: 4208 Rider Trail N. 63045 Earth City, MO, US

Website: jarrellcontracting.com

Likes: 318

Reviews

Add review

Facebook Blog



Jarrell Contracting 06.06.2021

Progress pics from our USPS LA P&DC Building Expansion project. Check out that rooftop view! (downtownLA). #jarrellmechanical #designbuild #hvacplumbing

Jarrell Contracting 20.05.2021

The Jarrell Team is excited to be partnering with LS Black on the VA Outpatient Clinic in Canton Michigan

Jarrell Contracting 01.05.2021

The Jarrell Team is excited to announce that we will be working with L.Keeley on the 4545 Laclede project! Stay tuned for project updates!

Jarrell Contracting 24.04.2021

Our team at Jarrell Contracting is making great headway in our project at The Music Factory in Chesterfield, MO, expect future progress updates!

Jarrell Contracting 04.04.2021

Our team at Jarrell is proud to announce the completion of our project at the Columbia Plaza Medical Center located in Columbia, MO. We replaced the original DOAS unit with a Trane 35-ton DOAS unit. Some fantastic work by our team in getting this unit installed, started-up and integrated into the building's controls system the past Saturday and Sunday.

Jarrell Contracting 19.11.2020

Jarrell Mechanical is happy to be a part of the Korte Team in building Glik’s new 50,000-square-foot office headquarters, distribution, and e-commerce facility in Collinsville, Illinois. The Design-Build, Tilt-Up facility includes approximately 20,000 square feet of office space and 30,000 square feet of distribution and e-commerce space. Jarrell is providing Design-Build HVAC services. As you can see the building is up and we are mobilizing and ready to go.

Jarrell Contracting 31.10.2020

Jarrel Project - 1815 Locust Rehab Photo 1 - Utilizing Uponor Piping for the domestic water and Sioux Chief rough-in boxes. Using the Sioux Chief boxes, once we hydro test, you do not have to shut the water off to connect the fixtures. The boxes come with shut off valves and safety caps so it can not be accidentally turned on. Photo 2 - Underground rough-in, ready to backfill.

Jarrell Contracting 29.10.2020

We here at Jarrell are preparing to begin work on the future home at Golden Oak Landing at 11737 Administration Drive. We are excited to work with Domash Design and VSP Construction on HVAC and control upgrades of the existing system!

Jarrell Contracting 17.10.2020

Eglin Air Force Base: Duct risers have been erected on the Eglin Air Force Base project after successful coordination with the rest of the project team. #Navy #NAVFAC #HVAC #JarrellMechanical #SMACNA

Jarrell Contracting 29.09.2020

Getting very close to finishing up USPS Milwaukee!